Note 1: Results of mechanical tests on chamber mockups with new beams
Note 2: Simulation of the drift field with new beams
Note 3: Measurement of the cell gain in a chamber with new beams
Note 4: Long term HV behaviour of mylar insulator
CMS IN 1999/005: Changes in the design of the CMS Muon Barrel Drift Chambers