Results about
synchronization (A.Meneguzzo et al., CMS IN-2004/045)
Some results on local trigger performance (J.Caballero et al., CMS
IN-2004/035)
Paper on the
trigger results, (May 04), published on NIM A 534 (2004),
441-485
Results
on the autotrigger runs (by. A.Meneguzzo, Mar 04)
Fourth report on data
analysis (about di-muons) (Feb 04)
Third report on data analysis (Dec 03)
Marcellini's report at CMS week, dec 03
Ronchese's report at CMS week, dec 03
Travaglini's report at ESR, nov 03
Second report on data analysis (23 Oct 03) (by
Padova)
Sara Vanini's presentation at SIF2003
Some
preliminary results (Sept 03) (by Madrid)
First report on data analysis (22 July 03) (by
Padova)
Pictures (by M.Bontenackels) -- Pictures (by J.Puerta)
The logbook
RUN LIST
Description of TRB configurations
Bunch train structure Distance between bunch trains Trigger jitter
About beam jitter
from SPS machine people
Instructions for the shifters
Shift list
Test beam strategy and program (by.
P.Zotto)
SPS
machine schedule.
Our
beam time at H6 (North Area)(19 May - 2 Jun)
Infos about 25ns beam time structure
Other infos about 25ns beam time structure
Scheme of the beam structure
Map of the H6 area
Maps of the X5 area: X5A X5B+GIF
|
Channel labels and ROB
layout
Useful links about DT trigger:
|